Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sydney domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the sydney domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121 Portfolio - CS^2 Electrical Engineering - Northwest Arkansas
National Wrestling Hall of Fame, Oklahoma State University Campus, Stillwater, Oklahoma. Completed June 2016.
Complete renovation and upgrade. As a museum project, this required extensive coordination with the architect, the museum exhibit designer, and the donor who was providing the lighting hardware.
The Meridia, Tulsa, Oklahoma.
Full electrical design for renovating this multi-story office building into luxury apartments with amenities on the ground floor.
Military Base Renovations, Midwest City, Oklahoma. Completed 2015.
Design and construction administration for multiple renovation projects, including Tinker Air Force Base, Fort Sill, and Altus Air Force Base. Collaborated with both the design-build contractor and the architect.
Fort Riley, Kansas. Completed 2015.
HVAC retrofit design and construction administration.
Gravette Schools Annex, Gravette, Arkansas. Completed 2014.
Electrical design for additions and improvements to existing structure.